You don't have javascript enabled. Good luck with that.
Pencarian
 335 Sepeda Motor Diberangkatkan Mudik Gratis dari Terminal Pulogadung

Free Mudik Program Departs 335 Motorbikes through Pulogadung Terminal

Some 335 motorbikes departed for free mudik (exodus) program from Pulogadung Terminal, East Jakarta, Wednesday (4/3). This departure was launched by Jakarta Transportation Agency (Dishub) Head, Syafrin Liputo, Pulogadung Sub-district Head, Syafrudin Chandra, and other related officials.

Travelers do not have to ride motorbikes to their hometowns

According to him, the 335 motorbikes were departed using 12 trailer trucks toward Semarang, Kebumen, Solo, Yogyakarta, Wonogiri, and Malang.

"Travelers do not have to ride motorbikes to their hometowns, the distance is quite long and tiring. Surely, this is to reduce the risk of traffic accidents," he expressed.

Dishub: Main and Backup Terminals Prepared for Idul Fitri Mudik Services

He added the departure was started promptly at 8 AM and was expected to arrive at its destination tomorrow.

"Tomorrow, the Acting Governor will release 12,160 travelers to 19 destination cities from Monas," he explained.

As for returning flow, the motorbikes will depart on April 13 from six cities with 11 trucks. Then passengers will depart on April 14 from 19 cities with 206 buses.

Pulogadung Terminal Head, Suratman explained all the motorbikes that will take part in this free homecoming have been on standby since last Tuesday (4/2) at 6 AM.

After the vehicle data was re-verified, the motorbike would then be fitted with a sticker as a sign that it had passed verification and for the destination city.

"For safety on the road, all petrol is emptied from the motorbike tank. Then from last night until this morning, the motorbike was loaded onto the truck," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1692 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1475 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1116 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye806 personDessy Suciati